Patel Aggregates LLP, Gujarat

CFlo's Combo X150 was commissioned by Patel Aggregates LLP to address the burgeoning M-Sand demand for some distinguished projects in Gujarat like the Surat Metro Rail & Bullet train.

Generic Image

Patel Aggregates LLP: Promoting safe and efficient construction services for a better tomorrow.

An eminent name in the quarry industry, Patel Aggregates LLP has been serving the construction industry for over 20 years. They have been a leading sand & aggregate manufacturer and supplier in Chikhli, associated with various urban infrastructure projects. For two such extensive projects, Patel Aggregates commissioned a Combo X150 plant from our flagship Combo platform.

Patel Aggregates is one of the key suppliers of the ongoing Bullet Train & Surat Metro Rail Project. Mumbai – Ahmedabad High-Speed Rail (MAHSR Bullet Train) project is a 508.17 km High-Speed Rail line planned to connect Mumbai (Maharashtra) with Ahmedabad (Gujarat) through 12 stations.

Surat Metro with 2 lines and 37 stations is a mass rapid transit system (MRTS) built to serve Surat, the second largest city in Gujarat, by the Gujarat Metro Rail Corporation (GMRC).

Wanting to transition from the earlier installed air classifier, Patel Aggregates decided to go with our patented technology which is backed by a legacy of providing uncompromised quality washed Manufactured Sand and are a pioneer in comprehensive Sand solutions for more than fifteen years.

Understandably, both projects required a huge and consistent supply of M-Sand of Zone II grade. Being a decade-old customer, Patel Aggregates was aware of our advanced equipment technology that assures superior M-Sand delivery with operational economies. Therefore, our client didn’t have second thoughts to approach us with the requirement of a high feed-capacity sand-washing plant that would be tailor-made to the demands of the two ongoing projects.

CFlo's Combo repertoire: Ready for all challenges

After a series of detailed discussions and developing an understanding of the client’s specific requirements, our officials introduced them to our latest innovation in the Combo line of sand washing equipment - Combo X150, ideal for unhindered, finest quality M-Sand supply.

Combo X150 is equipped for feeding, grading, dewatering, water recycling, conveying, and sludge handling. The plant can produce consistently graded M-sand with a high silt removal capacity of 15%. It has an impressive feed capacity of 150 TPH, 95% water recycling capacity, and up to 30% energy conservation capabilities. Combo X150 can operate for more than 18 hours a day and has a compact design requiring a significantly lesser geographical area to install. The plant is an ideal solution for saving the overall cement consumption in construction.

Powered by advanced technology – Combo X150 can efficiently process the VSI dust from crushing operations to produce quality concrete M-Sand (Zone II), thereby adding to the client’s top-line profits. With a low energy requirement per ton of feed and a dust-free system – Combo X150 is a true powerhouse of potential with a total noise output below 80db.

Witnessing and examining one of our existing plants in action in Chikhli further cemented the company’s faith in the high-end technology and quality of the sand output of CFlo.

The Combo X150 plant was finally commissioned on April 2022 and has since then kept up to its promise of being a high-functioning system producing an abundant amount of consistent quality sand for the client’s upcoming projects in Gujarat.

Expression of Appreciation

According to Mr. Mukeshbhai Faldu, Director, Patel Aggregates LLP, “When it comes to quality output and service commitment, our decade-long experience says that one can fully rely on CFlo and its sand-washing solutions. Credit is due to their entire team of experts in delivering perfect projects within time. They are a true pioneer in providing comprehensive and customized sand solutions  and as always, it was a joy working with them.”

Reciprocating the accolades, Nitin Dubey, Chief Revenue Officer, CFlo, said, “We are constantly looking forward to reinventing ourselves to renew the trust and faith that our ardent clients such as Patel Aggregates LLP have placed in us over the ages. Installing one of our latest innovations - Combo X150 was a welcome opportunity to put to test its comprehensive potential to manage a high volume of feed and produce quality output while maintaining a low carbon footprint and optimizing profit for the client in terms of operation and energy costs. We are proud that the Combo line of products continues to live up to expectations.”

To date, the plant has run for more than 800 hours and produced a total of 80000 MT of sand.

We thank our client for continuing to trust and support us by giving us prized opportunities and projects such as this.

Case Study on Patel Aggregates LLP


Related Products

Combo

Combo - Sand Washing Plant

Advanced Construction Sand Production Technology

Read More

CDE Asia website use cookies. Please click "Accept and Close" to accept the use of cookies on our website. By continuing to browse our website you consent to the use of cookies on this website.
For more information on how we use cookies please visit our Cookie Policy page, or visit our Privacy Notice page for more information on how we manage and use data.